Routing profile changes to the IP transit and peering routers in the London data centre
Maintenance Details
Location: London, DC5 Data Centre
Start Date & Time (GMT): Thursday, 12-December, 2013 9:00 p.m.
End Date & Time (GMT): Friday, 13-December, 2013 02:00 a.m.
Description of Work
Network engineers will apply routing profile changes to the IP transit and peering routers in the London data centre. These changes require a reload of each router. Routers will be reloaded at separate times and no disruption to services is expected, although there may be brief periods of increased latency during each reload. Network engineers will closely monitor the work and will do everything possible to minimize interruptions.
Services Affected
IP transit and peering traffic.
Impact
No downtime is anticipated.